A Sawyer company - serving Long Beach, CA
A remodeled primary bathroom with a soaking tub and a walk-in shower

PGT Bathroom Remodeling Nationwide

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Long Beach
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled hall bathroom with patterned floor tile and painted walls
A low-threshold walk-in shower with a bench and grab bar
A powder room with botanical wallpaper and a stone sink
A wood double vanity with two mirrors after a bathroom remodel
A single-story rear room addition with tall windows and a new patio
An open kitchen and dining area after a remodel
A whole-home remodel with the living, dining and kitchen areas opened up
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

PGT Bathroom Remodeling: The Long Beach Owner’s Guide

A PGT bathroom remodel in Long Beach typically runs $9,000 to $28,000 installed, and most homeowners discover they need one when a shower pan cracks, the vanity has swollen through, or grout keeps failing no matter how many times it’s caulked. We stock PGT-compatible bath hardware and finish materials on the truck, and we can usually have parts matched and the job scoped within one visit. The reality is that bathroom failures here don’t happen gradually in a way you notice. They hide behind the tile until you see a water stain on the ceiling below, or the shower door starts dragging because the curb settled.

Call (562) 512-6480

Which PGT Models This Applies To

A walk-in shower with large-format tile and a built-in niche

PGT’s bathroom product line spans a few distinct series, and matching parts comes down to two things: the glass spec and the hardware finish. PGT’s frameless and semi-frameless shower enclosures use proprietary hinge geometry, so an off-the-shelf hinge from a big-box store won’t seat correctly. The rollers and guides differ between the 3000-series sliding doors and the 5000-series pivot doors. If you’re not sure what you have, look for the etched PGT logo in the corner of the glass; if that’s worn off, measure the glass thickness. Most PGT bath glass is 3/8″ or 1/2″, and that measurement alone rules out a lot of wrong parts. For hardware, we match by finish family: brushed nickel, matte black, and oil-rubbed bronze are the common ones in Long Beach homes, and PGT’s matte black has a slightly warmer tone than the hardware store version.

Sawyer Remodel Long Beach is an independent service provider. We’re not affiliated with PGT directly, but we work with their product lines daily because they’re common in homes from Naples to Bixby Knolls. When we do a full PGT bathroom remodel, we typically pair the PGT glass with nicer plumbing fixtures from Kohler or Toto, and a Cambria or Silestone vanity top if the budget allows.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Signs Your PGT Bathroom Remodeling Is Failing

  • Shower door drags or binds at the bottom track. The rollers are shot, or the door has settled out of square. Either way, the fix usually involves replacing the roller assembly and re-hanging the door, not just adjusting screws.
  • Water stains on the ceiling below the bathroom. This means the shower pan liner or the drain assembly has failed. By the time the stain shows, the leak has been active for weeks or months, and the subfloor is likely compromised.
  • Grout cracks keep reappearing in the same spots. The substrate behind the tile is moving. That’s usually waterlogged backer board or a failed waterproofing membrane, and patching the grout won’t fix it.
  • Vanity doors won’t close flush, or the cabinet base is soft near the floor. Humidity in a Long Beach bathroom, especially one with no exhaust fan, will delaminate the cabinet box. Once the base swells, the cabinet is done.
  • Mildew smell that won’t go away even after cleaning. That’s trapped moisture behind the tile or under the pan. It’s not a cleaning problem. It’s a waterproofing failure.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

A remodeled primary bathroom with a soaking tub and walk-in shower

A PGT bathroom remodel in Long Beach lands between $9,000 and $28,000 installed, with most of the projects we quote falling in the $12,000 to $18,000 range for a standard 5×8 bathroom. The spread comes down to three things: whether the PGT glass stays or gets replaced, what’s behind the walls once we open them up, and finish choices. A basic re-skin with a new vanity, toilet, tile, and kept-in-place PGT shower runs on the lower end. A full gut with a new PGT enclosure, moving plumbing, and waterproofing to current code pushes toward the top.

Every scope we write is a line-item price. You see the parts cost, the labor, the permit fees if they apply, and the waterproofing materials before you approve anything. The price you see is the price on the invoice. Our 365-Day Done Right Promise covers the workmanship for a full year: if it’s not done right, we make it right, in writing.

DIY or Call Us?

You can safely do a few things yourself: replace a shower head, swap cabinet hardware, recaulk a seam that’s still intact. But once you’re dealing with a PGT shower enclosure, waterproofing, or anything behind the tile, you’re in territory where a mistake means water inside your walls and a much bigger bill six months from now. We’ve pulled apart bathrooms where someone DIY’d a pan liner and then tiled over it. The tile looked fine. The subfloor was mush. If you’re not sure what you’re dealing with, call us at (562) 512-6480 and we’ll tell you straight what you’re up against, no charge for the phone call.

FAQs

A freestanding soaking tub in a remodeled primary bathroom

Getting started with Sawyer in Long Beach

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Long Beach team

A local crew that works across Long Beach and the towns around it, to the same written standard as every Sawyer location.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Long Beach? Licensed & insured · Free in-home estimates response · free estimates
Call (562) 512-6480
Local Service Coverage

Request a Free Estimate in Long Beach

Tell us what you need - Sawyer Remodel Long Beach responds fast. No obligation.

By reaching out through this form, you acknowledge our Privacy Policy and agree that you may be contacted by phone, email, or text about your service request, including from the local pros who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch