







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Home Additions & ADU: The Long Beach Owner’s Guide
CGI home additions and ADU projects in Long Beach typically run $45,000 – $130,000 for a full addition, with detached ADUs landing between $90,000 and $220,000 depending on size, foundation work, and finishes. We handle CGI-style additions and ADU builds from permit drawings to final inspection, and we stock the framing hardware, tie-downs, and structural connectors these projects demand. Most owners call us after a failed addition or ADU attempt shows up as a cracked stucco seam, a sagging roofline where the new tie-in meets the old structure, or a city inspector flagging non-compliant shear wall work.
Here’s the thing about additions and ADUs: the failure usually isn’t the lumber. It’s the connection details, the load path, the waterproofing at the transition. Sawyer Remodel Long Beach is an independent contractor, not affiliated with CGI, but we work with their product specs regularly because Long Beach homeowners ask for them. Luca Romano has been doing this work across the city for nearly two decades, from Belmont Shore bungalow additions to garage conversions near the Queen Mary. The work tells you everything. The rest is just talking.
Which CGI Models This Applies To

CGI’s product line for additions and ADUs spans a few distinct categories: pre-engineered structural panels, steel moment frames for large openings, and the Simpson/CGI-style hold-down and strap systems that tie new framing to existing foundations. If you’re matching a failed part to a spec, start with the label printed on the product itself. CGI stamps a series code and load rating on steel connectors and panel edges. If the print is gone, measure the part: CGI hold-downs come in 16-, 18-, and 20-inch lengths for typical 2×4 and 2×6 wall framing in Southern California seismic zones.
The OEM versus aftermarket call matters here. OEM CGI straps and tie-downs are engineered to specific load paths and tested as a system. Aftermarket equivalents often match dimensions but not the load rating, and in Long Beach’s seismic zone 4, that’s not a place to guess. We stock OEM CGI connectors and the common generic equivalents that match spec for non-structural trim and flashing. For anything carrying shear or uplift load, we use OEM. Full stop. A $9 strap that fails is a $45,000 addition that fails with it.
Styles & brands we work with







Signs Your CGI Home Additions & ADU Is Failing
- Drywall cracks at the transition seam. When the new addition moves independently from the original house, you get hairline cracks where the two structures meet. That’s the first sign the tie-in connectors weren’t sized right or the shear panel wasn’t installed to spec.
- Sticking doors or windows in the new space. A settling addition puts pressure on door and window frames. If they were square at final walkthrough and stick six months later, the foundation or the framing connection is moving.
- Visible gaps at exterior corners or roofline. Long Beach gets heavy marine air and occasional wind-driven rain. Gaps at the fascia, rake, or corner trim mean water is getting behind the siding and into the framing, which rots hold-down anchors from the inside.
- Rust or corrosion on exposed straps and connectors. Salt air near the coast accelerates corrosion on uncoated steel. If you can see orange staining on metal connectors at the foundation or roof, those parts are losing strength.
- Squeaking or flexing floors in the addition. Floor joists that bounce or creak under normal walking load usually mean undersized joist hangers or missing blocking. CGI specs hangers by joist size and span, and one size down is silent until it isn’t.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For a failed structural connector or tie-down, installed replacement in Long Beach runs $400 – $1,800 depending on access and how much finish work has to be opened up. For a full addition re-tie or shear wall correction, you’re looking at $3,000 – $10,000. A complete ADU or addition build starts at $45,000 and goes up from there based on square footage, foundation type, and finish level.
Every quote includes the written price before work starts. That means the number on your estimate is the number on the invoice. You get live arrival time tracking, before-and-after photo updates, and a digital invoice you pay from a link. The 365-Day Done Right Promise covers the structural work for a full year: if it’s not done right, we make it right, in writing, no argument. All structural repairs are done by background-checked, uniformed technicians, and Luca Romano reviews every structural order before it ships to the job site.
DIY or Call Us?
Structural connectors and shear panels on an addition are not a weekend project. The loads involved, especially in a seismic zone, can turn a $400 strap replacement into a wall collapse if the temporary support isn’t done correctly. If you’re just inspecting, you can look for visible rust, cracked stucco seams, and gaps at trim transitions. Mark what you find, take photos, and call us. Do not start loosening bolts on a hold-down that’s under load. Those parts are holding your roof up right now.
If the part you need is a non-structural piece, trim, flashing, or a vent, some owners handle that themselves and that’s fine. For anything tied to the foundation, the roofline, or a shear wall, call (562) 512-6480. We’ll send someone who knows exactly what they’re looking at, and we’ll tell you the truth about whether it needs replacing or just needs proper torque.
FAQs

OEM CGI connectors with proper galvanization last 20 – 30 years in Long Beach’s coastal climate, but uncoated or lightly coated steel near the ocean can start corroding in 5 – 10 years. Coastal salt air is the biggest factor, not age. If you’re within two miles of the water, have a pro inspect exposed connectors every three to five years. Call (562) 512-6480 for an inspection estimate, it’s free.
Some can. If the connector is intact but loose, the fix is often retorquing and adding a reinforcing plate, not full replacement. If the steel shows flaking rust, pitting, or deformation, it needs replacement. The only way to know is getting eyes on it and checking the load rating against the current spec. Call us and we’ll tell you straight.
Most single-connector replacements take 2 – 4 hours, including opening up the finish, swapping the part, and patching. A full shear wall re-tie or multi-point correction can take two to three days. You’ll get a written time estimate before we start, with live arrival tracking so you’re not waiting on a four-hour window.
We stock common CGI hold-downs, straps, shear panel fasteners, and joist hangers on our trucks for standard 2×4 and 2×6 framing. Specialty series parts with long lead times get ordered the day you approve the quote, and we handle that for you. You never chase a parts supplier. When you call (562) 512-6480, we’ll confirm same-day whether the part is on the truck or needs to be ordered, and give you the exact price either way.
Written by Luca Romano, Owner, Sawyer Remodel Long Beach at Sawyer Remodel Long Beach, serving Long Beach and nearby areas.


